Single logo
  • Courses
  • Blog
  • About
Join on SkoolJoin on Skool

In this topic

AI Engineering
  • The AI Stack in One Picture: Six Layers Every AI Product Is Built From
  • Tokenization: What an LLM Actually Sees When You Type
  • LLM Tokens, Context Windows and Cost: What One Question Really Costs
  • What an LLM Can and Cannot Do: One Prediction Loop, Its Strengths and Its Gaps
  • Structured LLM Output with Pydantic: Describe the Shape Once, Check Every Reply
  • Temperature, Top-p and Sampling: Why the Same Prompt Gives a Different Answer
  • Open vs Closed LLMs: Cost, Control, Privacy and Capability, Decided per Workload
  • Streaming and Error Handling for LLM Calls: Show the First Word Early, Retry Politely, Fail Calmly
  • Practice: Build a CLI Chat Tool with Memory, Commands, Error Handling and a History Cap
  • Explicit Criteria vs Vague Prompts: Turn Every Adjective Into a Check a Script Can Run
  • Few-Shot Prompting Done Right: How Many Examples, How Different, What Order, and the Leak That Lies
  • Prompt Caching: Keep the Start of Every Request Identical and Pay for the Long Part Once
  • Prompt Versioning and Testing in a Repo: Prompt Files, a Registry, a Hash per Answer and Tests That Gate
  • Context Engineering: What Belongs in the Context Window, Turn by Turn
  • Context Engineering for a Long-Running Agent: Clear, Compact, Take Notes, Prove It
  • Zero-Shot, Few-Shot or Reasoning: Pick the Cheapest Prompting Technique the Failure Asks For
  • What an Embedding Actually Is: Meaning as Numbers, Search by Closeness, and Where Hand-Made Numbers Break
  • The RAG Pipeline Explained: 7 Stages From Documents to a Cited Answer
  • Similarity Search: Finding the Closest Vectors with NumPy and NearestNeighbors
  • Why RAG Exists: The Problem It Solves, Compared With Pasting Everything and Fine-Tuning
  • Real Embedding Models: an Open Model or a Provider API, Then Search, Duplicates and Recommendations
  • Chunking Strategies for RAG: Fixed Size, Sentences or Headings, Measured on One Handbook
  • Vector Databases Hands-On: The Same Search in Chroma and pgvector
  • RAG Prompt Assembly and Citations: Number the Blocks, Fit a Token Budget, Check Every Claim
  • Hybrid Search: BM25 Plus Dense Embeddings, Merged With Reciprocal Rank Fusion
  • Reranking With a Cross-Encoder: When the Second Pass Helps, and When It Doesn't
  • Retrieval Evals: Score the Retriever With Recall@K, MRR and nDCG Before Blaming the Model
  • Choosing a Vector Index: Flat, HNSW or IVF-PQ, a Memory Estimate, and Filters That Starve Small Customers
  • Citations and Abstention in RAG: What a Citation Proves, and When the Right Answer Is "It's Not in the Documents"
  • Embedding Migration With Zero Downtime: Two Indexes, a Dual-Write Backfill, a Shadow Check and a Flag
  • Cosine, Dot Product or Euclidean Distance: Why Three Measures Pick Three Winners, and the One Fix
  • Choosing an Embedding Model: Dimension, Context Length, Domain and Cost, Tested on Your Own Questions
  • Loading and Parsing Real Documents for RAG: PDF Headers, Wrapped Lines, Tables and HTML Chrome, Scored
  • Where Naive RAG Fails: Five Ways the Simplest Retriever Hands the Model the Wrong Pages
  • RAG Generation Metrics: Faithfulness, Groundedness and Relevance, One Claim at a Time
  • Capstone: A Production RAG Service Over the Python Standard Library, With an Eval a Hiring Manager Can Rerun
  • Agentic Search or RAG: an Index Decides Before the Call, Search Tools Decide During It
  • A Retrieval Router: Match the Route to the Data Shape and the Query Pattern
  • Progressive Discovery or Monolithic Context: Load It All, Fetch by Index, or Both
  • Building a Claims Assistant: RAG, an Eval Harness With a Gate, and OpenTelemetry Tracing
  • Context Engineering for a Long-Running Agent: Clear, Compact, Take Notes, Prove It
  • What LangChain Is For, and When to Skip It: Five Standard Parts, One Pipe, and a Decision Table
  • Why Chains Break: No Branch, No Retry, No Pause, and the Same Refund Assistant as a LangGraph Graph
  • LangGraph Nodes, Edges and State: Build Your First Graph, Route With a Conditional Edge, and Read the Run Three Ways
  • Human-in-the-Loop and Checkpointing in LangGraph: interrupt, a SQLite Save Slot and Command(resume=...)
  • Multi-Agent Patterns: Hub and Spoke in LangGraph, With Short Briefs, Owned Tools and a Retry the Hub Decides
  • A Research Agent in LangGraph: Plan, Search, Read, Write, and a Check Node That Rejects Citations Nobody Read
  • What Is MCP? One Plug Between AI Apps and Tools: Host, Client, Server and the Three Messages
  • Configuring MCP Servers in Claude Code: A Command or a URL, Three Scopes, and Three Moves When One Breaks
  • Workflow or Agent: Decide Who Picks the Next Step, Then Let the Constraints Choose the Design
  • Custom Agent Loops and Harnesses: A Dispatch Table, an Approval Hold, Error Results and a Turn Budget
  • Building an MCP Server: Tools, Resources and Prompts in Python and TypeScript
  • MCP Transports: stdio or Streamable HTTP, and Who Starts the Server
  • Deploying and Authenticating an MCP Server: Environment Keys for stdio, Bearer Tokens and Scopes for HTTP
  • A Remote MCP Server in Production: Tokens Bound to One Server, Tool Versions Side by Side, and a Gateway With Its Own Upstream Token
  • MCP, an API/CLI Call or Agent-to-Agent: Choosing How Claude Connects to a Capability
  • From ML Metrics to LLM Evals: Same Ruler, New Targets
  • Why You Cannot Ship an LLM Feature Without an Eval: Five Parts, Three Graders, One Tiny Eval
  • Building a Golden Dataset for LLM Evals: Cases, a Schema, a Coverage Table and a Seeded Split
  • Retrieval Evals: Score the Retriever With Recall@K, MRR and nDCG Before Blaming the Model
  • Regression Testing an LLM Bot in CI: A Golden Set, Two pytest Gates and GitHub Actions
  • Testing a RAG Bot Before It Ships: Slices, a Release Gate per Slice, and the Week After
  • RAG Generation Metrics: Faithfulness, Groundedness and Relevance, One Claim at a Time
  • LLM-as-Judge: Write a Rubric, Check Every Verdict, and Trust the Grader Only After Kappa Says So
  • RAGAS and Custom Evals: Framework Faithfulness Plus Your Own Citation and Required-Fact Checks, Behind One Gate
  • Which Test Layer Owns the Failure? Unit, Functional, Integration and End-to-End Tests for a Claude App
  • Six Ways a 200 Can Still Be Wrong: Hallucination, Refusal, Under-Acting, Context Loss, Format Drift and Inconsistency
  • Keeping an Eval Suite Valid: Check It for Contamination, Saturation and Coverage Before You Trust a Green Gate
  • Eval Metrics by Task Type, and Evaluating a Non-Deterministic Agent With Repeated Trials
  • Proving a Model Upgrade Is Ready: A Frozen Golden Set, a Calibrated Judge, the Right Layer and a Release Gate
  • The Failure Nobody Saw: Finding the Instrumentation Gap in an LLM Agent
  • Six Metrics, Not One Score: Accuracy, Groundedness, Latency, Cost, Safety and Security for an LLM Agent
  • The Metric That Would Have Caught It: Finding Eval Coverage Gaps After a Green Suite
  • Eval Datasets and Mixed-Method Test Frameworks: Code Checks, an LLM Judge and Human Review
  • Calibrating an LLM Judge: Diagnosing Position, Verbosity, Self-Preference and Drift
  • Trials per Case: Separating a Real Effect From Run-to-Run Variance When You Compare Two Prompts
  • Diagnosing a Bad Answer: Prompt Failure, Hallucination or Model Mismatch?
  • Building a Claims Assistant: RAG, an Eval Harness With a Gate, and OpenTelemetry Tracing
  • Fallback Models for an LLM App: A Chain That Checks Region and Fit, Flags Degraded Answers and Gets Rehearsed
  • Back Pressure for LLM Traffic: Bound the Queue, Give Chat Its Own Lane, Count Tokens, Cancel When the Caller Leaves
  • Load Balancing LLM Traffic: Count the Work, Weigh the Prefix Cache, Check Real Health, Drain Before Deploys
  • A Message Queue for Document Ingestion: At Least Once, Leases, an Idempotent Consumer and a Dead Letter Queue
  • Caching for AI Apps: Four Layers, What Goes in Each Key, and How a Delete Travels
  • Semantic Caching: Why a Similarity Threshold Can't Stop Confident Wrong Answers
  • LLM Model Routing: Rules, a Classifier or a Cascade, Judged on Cost per Win and Every Topic
  • Cutting p95 and Cost in Half for an LLM App: Read the Bill, Match the Lever, Guard Success
  • Observability and Tracing for LLM Apps: A Span per Stage, Redaction First, Bad Traces Become Tests
  • Guardrails for an LLM Agent: Check What Comes In, What It Wants to Do, and What Goes Out
  • Embedding Migration With Zero Downtime: Two Indexes, a Dual-Write Backfill, a Shadow Check and a Flag
  • Design a Multi-Tenant RAG Assistant, Part 1: Requirements, Rough Numbers and a Contract
  • Design a Multi-Tenant RAG Assistant, Part 2: Tenant Isolation, a Scoped Cache and Walking an Outage
  • A 500 MB PDF Takes 50 s to Answer, Get It to 2 s: Measure First, Then Promise Per Path
  • A 500 MB PDF From 50 s to 2 s, the Fast Path: Queue, Status, Streaming and an Acceptance Test That Fails
  • FastAPI for AI Services: Schemas at the Door, Load Once in the Lifespan, Depends, and def vs async def
  • Streaming LLM Answers From FastAPI: Sources First, Token Events Over SSE, and the Same Events Over a WebSocket
  • Docker for AI Apps: Bake the Model Weights In at Build Time, Use CPU-Only PyTorch, and Run Offline
  • Deploy a RAG Service: A Service Key, Health and Ready Checks, Caddy in Front and a Smoke Test
  • Cost Tracking and Budget Guards for an LLM App: Count the Tokens, Log Every Call, Check Before You Spend
  • Versioning Prompts, Models and Indexes: Three Moving Parts, One Release File and a One-Line Rollback
  • Retries With Limits for LLM Calls: Jitter Under a Capped Ceiling, a Retry Budget, a Circuit Breaker and a Graceful Reply
  • Multi-Tenant Quotas for One Shared LLM: a Bounded Line per Tenant, Fair Turns and a Pause When the Model Says Wait
  • Find the Binding Constraint Before You Tune: Requests, Input Tokens or Output Tokens per Minute, and When to Send a Batch
  • SLIs and SLOs for an LLM Service: Count Good Events, Promise a Level, Page on Burn Rate
  • Drift After a Model Update: Tag Every Event, Split the Dashboard by Version, Alert Against a Baseline
  • Trace Analysis at Scale: Tail-Sample to Read, Count Every Trace by Failure Cohort to Measure
  • Incident Response for an LLM Agent: Triage, Flip the Pointer, Check the Canaries, Then Tell People
  • From Incident to Regression Eval and Postmortem: One Incident, Three Things Left Behind, and a Gate That Remembers
  • Fleet Cost Forecasting for an LLM Service: Profile per Workload, Times Mix, Times Volume
  • From One Claude Call to a System: Input, Processing, Output and the Feedback Loop
  • Stress-Testing an LLM Architecture: Find the Component That Fails First
  • Five Reference Architectures for Claude Systems: Read the Cue, Name the Shape
  • Business Value Pillars for an LLM System: Turn "Cheaper and Faster" Into Targets, Then Pick the Lane
  • The Claude Model Ladder: Pick the Cheapest Model That Passes, Then Price the Month
  • Connecting Claude to a Legacy System You Can't Change: The Adapter Pattern
  • Speed Has a Price and the Rate Limit Is the Ceiling: Choosing Model, Effort and Fast Mode per Path
  • Reliability Controls for Claude Apps: Backoff, Idempotency Keys, Fallback Routing and Circuit Breakers
  • Observability at Scale and a Gated Rollout: Metrics for All, Traces by Rule, Content on Trigger
  • The Failure Nobody Saw: Finding the Instrumentation Gap in an LLM Agent
  • An Ops Runbook for Claude Failures: Case Cards, Request IDs, Owners and a Read-Only Investigation
  • Guardrails for an LLM Agent: Check What Comes In, What It Wants to Do, and What Goes Out
  • The Agent Attack Surface: Blast Radius, Narrow Tools, Scoped Keys and the Dangerous Three
  • Prompt Injection, Jailbreaks and Untrusted Input: Label What Comes In, Gate What Goes Out
  • Injection Exposure Review for an Agent: Map Inputs, Data and Effects, Layer Every Path, Retest the Job
  • Data Leakage and PII in LLM Apps: Redact, Minimize, Log Safely and Count Every Place
  • Hooks That Block Destructive Actions: a PreToolUse Gate That Allows, Asks or Denies
  • Claude API Keys: Keep the Key on a Server Proxy, One Key per Environment, Rotate and Scope It
  • Tuning an LLM Guard: False Positives Against False Negatives, a Review Band, and Model Refusals
  • Red-Teaming an LLM Agent with the OWASP LLM Top 10 and the NIST AI RMF: Judge What It Did, Not What It Said
  • Least-Privilege Tools and an Audit Log for Agent Actions: Grant by Job, Decide in Code, Record Every Allow and Deny
  • Agent Identity with Workload Identity Federation: a Short-Lived Token Instead of a Static Key, and Tool Secrets Kept in the Harness
  • Memory Poisoning and Tool Poisoning in LLM Agents: Three Doors In, Two Ways Out, and the Controls That Hold
  • Authentication and Authorization for Claude Agents: Find the Gaps Hop by Hop
  • Risk Framing for LLM Systems: A Risk Register Ranked by Exposure, Not by Odds
  • Ranking Deployment Risk: Attack Surface, Failure Modes, Quota Exhaustion and Supply Chain
  • Human-in-the-Loop Routing: Send Each Agent Action to Auto, Review or Block by Confidence, Reversibility and Cost
  • Compliance for an LLM System: Tie Every Obligation to a Control, an Owner and Evidence
  • Control Sets for Compliance: Residency, Retention and ZDR, PII Redaction, Audit Logs and Tenant Isolation
  • Bias, Fairness and Transparency in LLM Decisions: Find the Source of a Gap, Then Pick the Fix
  • An AI Governance Operating Model on One Page: Risk Tiers, Named Gates and Re-Gating on Change
  • A Regulated Dispute Desk on Claude: Pin the Geography, Gate by Risk, Log Before Release, Fail Closed
  • The AI Reply Is Untrusted Too: Links, Commands and Hidden Content in What It Writes Back
  • Poisoned Data, Poisoned Models and the AI Supply Chain: Attacks Before Anyone Types a Prompt
  • How Data Leaks from AI Tools: Five Quiet Ways Out, Shadow AI and a Table of What May Go Where
  • AI for Defenders, and AI in Attackers' Hands: Faster Alert Triage, Cleaner Phishing, Cloned Voices and the Habits That Still Work
  • AI Security Frameworks in Plain Words: NIST AI RMF, ISO/IEC 42001, the EU AI Act and the OWASP Top 10 for LLMs
  • AI Policy, the Risk Register and Who Owns What: An Inventory, One Owner, a Two-Question Score and a One-Page Policy
  • Reading a Business Requirement Like an Architect: Function, Quality, Constraints and Assumptions
  • Discovery for an AI Project: Running the First Conversation, Five Question Groups and Three Red Flags
  • Communicating AI Decisions, Trade-offs and Risk to Executives: The Decision Card, the Risk Matrix and One Ask
  • Feedback Loops, Expectations and SLAs for an AI Service: Find the Promise the Architecture Can't Keep
  • Documenting an AI Architecture for Handoff: One Document per Reader, a Handoff Gate and Rules With a Reason
  • The Architecture Decision Record for a Claude System: Context, Options, Decision, Consequences and the Evidence You Will Need
  • The Evidence Readout: Presenting Eval Numbers and Traces to Stakeholders as a Decision
  1. Blog
  2. /
  3. AI Engineering
  4. /
  5. AI Security

Risk Framing for LLM Systems: A Risk Register Ranked by Exposure, Not by Odds

Five SupportDesk features each carry one LLM failure mode. Ranked by how often they fail, the irreversible refund sits fourth and the attachment injection last. Ranked by exposure (likelihood times impact, plus one if it cannot be undone), the refund leads and the attachment moves to third.

Chaand Sheikh

·27 November 2026AI Security

What you will learn

  • Name six LLM limits: hallucination, knowledge limits, variance, context limits, untrusted input and over-agency
  • Explain why a limit becomes a risk only when it meets a feature
  • Score each risk as likelihood times impact, plus one when it cannot be undone, and rank by that exposure
  • Pick the control family for each failure mode, starting from the top of the ranking

Before you start

  • What an LLM can and cannot do
  • Common LLM failure modes

Picture the support agent one week before launch. Every feature is ready, and every one of them can fail. Where do you start?

This article names the limits, the failure modes and the exposure, then ranks the risks so the controls know where to begin. The key idea: a limit of the model becomes a risk only when it meets a feature.

Where failures enter SupportDesk

SupportDesk has four stages: the input, Claude, the reply and the action. A ticket and an article go in, Claude writes the reply and acts through a tool. A failure can enter at every stage:

  • At the input, a hidden instruction can sit inside a ticket.
  • In the model, a fact can be made up.
  • In the reply, a wrong answer reads as fluently as a right one.
  • At the action, the refund can be wrong.

So you keep one list, a risk register, that covers every stage and ranks every failure by its exposure.

Six limits, one new intern

Think of a brilliant new intern on day one:

  • It sounds sure of every answer, even when it guesses. Hallucination.
  • It has never seen your private files or your newest policies. Knowledge limits.
  • Ask it twice, and the wording, or even the answer, can differ. Variance.
  • In a very long file, it misses details buried in the middle. Context limits.
  • It follows any note it finds on the desk. Untrusted input.
  • It holds the keys, so a slip becomes an action. Over-agency.

Six limits. But a limit is a fact about the model; it is not yet a risk. For a broader tour of what models can and cannot do, see what an LLM can and cannot do, and for the full catalogue of failures, LLM failure modes.

One limit, two risks

Take one limit, a made-up fact, in two features. In the first, the feature answers a policy question. The customer reads the answer as fact, and a wrong policy costs trust. In the second, the feature drafts a reply for an agent. A person reads it before it goes, and a wrong line is cheap to fix.

The risk lives in the feature Limit a made-up fact answers a policy question drafts a reply for an agent customer reads it as fact a person checks: cheap to fix
Same limit, different risk. The risk lives in the feature, not in the model alone.

Rate the feature, then size it

To size a risk, ask three questions about the feature:

  1. How likely? How often do you expect this failure to land? Rate it 1 to 3.
  2. How bad? What does it cost the customer or the business? Also 1 to 3.
  3. Can it be undone? Can you take the result back after it happens? Yes or no.

Put them together: exposure = likelihood x impact, plus one when it cannot be undone. These ratings are the team's own judgement, not measured rates.

The register in code

This project makes no model call. It reads five features from risks.json, each with one failure mode and the team's ratings:

[
  {"id": "R-1", "short": "policy answer", "feature": "Answer a policy question",
   "mode": "hallucination", "likelihood": 3, "impact": 2, "reversible": true},
  {"id": "R-2", "short": "long thread", "feature": "Summarise a long ticket thread",
   "mode": "context", "likelihood": 3, "impact": 1, "reversible": true},
  {"id": "R-3", "short": "phrasing", "feature": "Phrase a reply to the customer",
   "mode": "variance", "likelihood": 2, "impact": 1, "reversible": true},
  {"id": "R-4", "short": "refund", "feature": "Issue a refund",
   "mode": "over-agency", "likelihood": 2, "impact": 3, "reversible": false},
  {"id": "R-5", "short": "attachment", "feature": "Read a customer attachment",
   "mode": "injection", "likelihood": 1, "impact": 3, "reversible": false}
]

First, the habit being replaced, odds_only.py:

def rank(risks):
    by_odds = lambda r: r["likelihood"]
    return sorted(risks, key=by_odds, reverse=True)

Most frequent first, and nothing else counts. Then register.py:

CONTROL = {
    "hallucination": "ground and cite",
    "context": "test long inputs",
    "variance": "measure over many runs",
    "over-agency": "least privilege and approval",
    "injection": "isolate untrusted input",
}


def exposure(risk):
    score = risk["likelihood"] * risk["impact"]
    if not risk["reversible"]:
        score += 1
    return score


def rank(risks):
    return sorted(risks, key=lambda r: (-exposure(r), r["id"]))

It holds one control family for each failure mode (only named here), scores likelihood times impact, adds one when the risk cannot be undone, and ranks by exposure.

Two rankings of the same five risks

odds-only ranking
1 R-1 policy answer   hallucination odds 3
2 R-2 long thread     context       odds 3
3 R-3 phrasing        variance      odds 2
4 R-4 refund          over-agency   odds 2
5 R-5 attachment      injection     odds 1
register ranking
1 R-4 refund          over-agency   exposure 7  least privilege and approval
2 R-1 policy answer   hallucination exposure 6  ground and cite
3 R-5 attachment      injection     exposure 4  isolate untrusted input
4 R-2 long thread     context       exposure 3  test long inputs
5 R-3 phrasing        variance      exposure 2  measure over many runs
moved up: R-4 refund from 4 to 1
moved up: R-5 attachment from 5 to 3
Odds-only against exposure ranking By odds By exposure 1 policy answer 2 long thread 3 phrasing 4 refund 5 attachment 1 refund (7) 2 policy answer (6) 3 attachment (4) 4 long thread (3) 5 phrasing (2)
From the recorded run. The two irreversible, high-impact risks (red) move to the top once impact and undo count.

The refund comes first: 2 x 3, plus one because it cannot be undone, exposure 7. Its control family is least privilege and approval. The policy answer is second: 3 x 2, exposure 6, so ground the answer and cite the source. The attachment is third: rare, but costly and permanent, exposure 4, so isolate untrusted input. The long thread and the phrasing come last: test long inputs, and measure over many runs.

The odds-only code never read the impact or whether the result can be undone. How often a feature fails is not the same as how much it costs. Building the controls themselves (the safety stack, human review routing, threat modelling) is the work that follows; for the least-privilege side, see agent blast radius and least privilege. Deployment risks such as attack surface, quota exhaustion and the supply chain get the same treatment in ranking deployment risk.

The trap: the review has time for two

A launch review has time to harden only two of five features. Which two go first? Three answers tempt you:

  • Pick the two that fail most often. That gives the policy answer and the long thread, and leaves the refund alone.
  • Add a disclaimer to every output. A disclaimer does not stop a wrong refund.
  • Wait for a larger model. The refund tool still holds the keys.

Each one skips the consequence. The answer rates likelihood and impact, counts what cannot be undone, and starts at the top: here, the refund and the policy answer.

Recap

StepQuestionIn this register
The limitWhat can the model not do?Six limits, from hallucination to over-agency
The featureWhere does it meet a consequence?Five features, one failure mode each
The ratingLikelihood, impact, can it be undone?Exposure from 2 to 7
The controlWhich family, starting where?Refund first: least privilege and approval

Try it yourself

Add a sixth feature to risks.json from your own product. Rate it honestly, run the register and see where it lands. Then flip its reversible flag and check how far it moves. The project files for this lesson are in the community, free to join.

Tried the exercise? Share your answer or ask a question.

The StudyEasy AI Community is free to join, with the lesson files, notebooks and code.

Join free on Skool

Keep going in AI Engineering · 133 of 153

Previous
Authentication and Authorization for Claude Agents: Find the Gaps Hop by Hop
Next post
Ranking Deployment Risk: Attack Surface, Failure Modes, Quota Exhaustion and Supply Chain

Related course on Udemy

Claude Certified Architect - Professional (CCAR-P) Exam Prep

Architecting with Claude: design, models, context, integration, evals, governance and stakeholders.View on Udemy ↗: Claude Certified Architect - Professional (CCAR-P) Exam Prep (paid course, opens in a new tab)

Related posts

Guardrails for an LLM Agent: Check What Comes In, What It Wants to Do, and What Goes Out

An agent that reads customer emails and can refund up to $200. In a small simulation, a phrase filter still lets 6 of 8 written attacks do harm and blocks 2 honest users; plain checks outside the model take harm to 0 of 8, at a cost of 1 honest request failed and 2 held.

The Agent Attack Surface: Blast Radius, Narrow Tools, Scoped Keys and the Dangerous Three

A support agent reads a ticket that says run SELECT * FROM customers and email the result outside, and it has run_sql and send_email, so the customer list leaves. The model wasn't hacked, it was equipped. Map each tool by what it reads, changes and sends, replace the two large ones with narrow tools, scope the keys, and never give one agent untrusted input, private data and a way out together.

Prompt Injection, Jailbreaks and Untrusted Input: Label What Comes In, Gate What Goes Out

Three texts reach a support agent in one week: an injected ticket, a poisoned help article and a jailbreak. A naive agent turns all three into leaks; three small checks in plain code take that to zero.

Injection Exposure Review for an Agent: Map Inputs, Data and Effects, Layer Every Path, Retest the Job

Review a refund agent the way a security team would: map where stranger text gets in, what it can read and what it can do, layer every path, then show the four normal questions still give the same answer.

On this page

  • Where failures enter SupportDesk
  • Six limits, one new intern
  • One limit, two risks
  • Rate the feature, then size it
  • The register in code
  • Two rankings of the same five risks
  • The trap: the review has time for two
  • Recap
  • Try it yourself
Community · Free to join
Single logo

StudyEasy AI Community

Hosted onSkool

Learn AI engineering, share what you build, and connect with other learners.

  • Free resources: lesson files, notebooks and code

  • Ask questions and join engineering discussions

  • Meet real people learning and building with AI

Join free on Skool

Related course on Udemy

Claude Certified Architect - Professional (CCAR-P) Exam Prep

Architecting with Claude: design, models, context, integration, evals, governance and stakeholders.View on Udemy ↗: Claude Certified Architect - Professional (CCAR-P) Exam Prep (paid course, opens in a new tab)

Single logo

Empowering Education, One Course at a Time

About
About usContact us
Legal
Terms of UsePrivacy Policy

© 2026 StudyEasy Organization. All rights reserved.